|
Invitations to Bid/Quote on Town Work and
Supplies.
Request for
Proposals FY14 Insurance
Bid to Purchase 1997 Cat
Loader
Interior
Painting of Lee Memorial Hall
Attachment 1.
Scope and forms
Attachment 2. Directions
Wage Rates
Airconditioner Replacement
Invite to Bid 1988 Ford F-350
Invite to Bid
Winter Sand
Invite to
Bid - Police Vehicle
Invite to
Bid - Fire Engine
Invite
to Bid - Ditch Cleaning
A. Specs
Invitation to Bid - Road paving
Please send
Angela Cook the Companies information at
acook@town.lee.ma.us
if printing out
the Bid Specs off the web
Addendum 1
Addendum 2
Air Conditioner
Replacement
Professional
Engineering Services Replacement of Bridge Meadow St. Over Powder Brook
Lee DPW Garage
Roof Replacement
Wind Power
Feasibility Study Request for Proposals
REQUEST FOR PROPOSAL TOWN OF LEE SLUDGE DISPOSAL 2012
Invitation to bid - South Lee Water
Storage Tank Painting & Related Work
Request For Proposal Town of Lee Sludge
Disposal 2012
Quote Request Delivered
Chemicals at Water Treatment Plant
Quote
Request for Emergency Snow Removal
Quote Request for Emergency work-Non snow related
Invitation to Bid - Memorial Hall
and Central Fire station Painting and Exterior Window Washing
Invitation
to bid - Refuse
Removal and Recycling Services
Invitation
to bid Lee - Lenox Solar Energy
Invitation to Bid for Revaluation
Services
Invitation to Bid - So. Lee Fire
Station and Post Office Exterior Insulation and Finish System
For Reference Only, Closed Invitation to Bid -
South Lee Fire Station and Post Office in South Lee
For Reference Only, Closed Invitations to Bid - Central Fire Station Supplemental Attic Insulation and Burner Replacement>
For Reference Only, Closed
Events Planner
Request for Proposals
For Reference Only, Closed New Backhoe Loader
For Reference Only, Closed DPW Request for Bid
For Reference Only, Closed
Request For Bids on a Backhoe Loader
For Reference Only, Closed Request for Proposals
East Side Parking
For Reference Only, Closed
Request for Quotations
Two new backhoe loaders
Due July 28, 2010, before 2:00 pm
For Reference Only, Closed Request for Quotations
Refuse removal and recycling services
July 1, 2010 through June 30, 2011
The Town of Lee, Board
of Public Works will accept written quotations for refuse removal and recycling
services per the enclosed form.
For Reference Only, ClosedRequest for Quotations
Uniform and Mat Rentals
July 1, 2010 through June 30, 2012
The Town of Lee, Board of Public Works will accept written quotations for
Uniform and Mat Rentals per the enclosed form.
For Reference Only, ClosedThe Lee
Housing Authority, the Awarding Authority, invites sealed bids from
General Contractors for Paving, sidewalks and Drainage Improvements at William
J. Brown Court (667-1) for Lee Housing Authority in Lee,
General Bids will be received until 12:00 p.m., Friday April 30, 2010
ROADWAY RECLAMATION AND REPAVING
For Reference Only, Closed
LEE BIKEWAY, Request for Qualifications and Proposals,
Professional Engineering Services
Request for
Qualifications and Proposals
Lee Bikeway
Study
Standard
Application Form PDF
Standard
Application Form DOC
For Reference Only, Closed
WATER TREATMENT
PLANT ENERGY EFFICIENCY, HYDROELECTRIC AND PHOTOVOLTAIC INSTALLATION INVITATION
TO BID
For Reference Only, Closed
Winter Sand Invitation
To Bid
For Reference Only, Closed
Water Line Replacement - Invitation to bid.
Quotations are due by 2:00 PM, Thursday, August 6, 2009 at the Department of
Public Works Office 45 Railroad St., Lee, Ma 01238
For Reference Only, Closed June 30, 2009
Request for Quotations for
refuse removal and recycling services.
Quotations are due by 2:00 PM, Tuesday, June 30, 2009 at the Department of
Public Works Office 45 Railroad St., Lee, Ma 01238
For Reference Only, Closed April 30, 2009 at 2:00 pm.
REQUEST FOR QUALIFICATIONS AND PROPOSALS
PROFESSIONAL ENGINEERING SERVICES
LEE DRINKING WATER TREATMENT PLANT
RENEWABLE ENERGY AND EFFICIENCY UPGRADES TO THE PLANT
Attached is the Request for Qualifications and Proposals , Professional
Engineering Services, Lee Drinking Water Treatment Plant, Renewable Energy and
Efficiency Upgrades to the Plant. It consists of the following components:
1. RFQ/P
2. Commonwealth of
Massachusetts Standard Designer Application Form for Municipalities...
3. Energy Audit for the
Water Treatment Plant, March 2009 Final Report
4.
Energy Conservation Audit for the Water Treatment Plant, May 2008
5.
Comprehensive Energy Audit for the Water Treatment Plant, April 2008
6. Renewable
Energy Assessment for Massachusetts Energy Management Pilot, July 15, 2008
7. State
Office of Minority and Women Business Assistance General Guidelines to
Municipalities
School
Bus Transportation Bid Request (Closed April 9, 2009 at 10:00am) |